Friday, May 22, 2009

House Renovation Spring 2009

Recent house projects include stripping, repairing, and painting two walls in the study; removing, stripping, and polishing door and window hardware from the second floor; cleaning and refurbishing all the doors on the second floor (not pictured); and stripping a portion of the living room and downstairs hall in preparation for carpet.

Eliana "hiding" in the study with big dog and little dog.

We found this color green inside this small study closet.
We think the color is original.

We left two walls papered as they were when we bought the house.
The wallpaper was in the house when the previous owners bought it in 1978.

Polishing brass and watching Seinfeld.







This is the floor we un-covered then re-covered in the study. Stunning.

Eliana looking down a living room vent on the day the carpet layers came.

The rope outlining the curve from the front door to the hall.
Finished. The same carpet is in the study.

2 Comments:

Anonymous Anonymous said...

Hello

6:18 PM  
Anonymous Anonymous said...

Hello

6:18 PM  

Post a Comment

<< Home